01707 324523 info@ambar-kelly.com
Designer and manufacturer of RiserSafe®
CE Certified
SCCS Certificates
Patented Design
GB 2429021B
GB 2443693B
Health & Safety
CDM 2015 Compliant
REQUEST CALL BACK

Post Tension Concrete Frame without M & E Design

Post Tension Concrete Frame without M & E Design

RiserSafe® supplied with blank floor plates to be changed out for new pre-cut floor plates and lids once the M&E design done.

Post tensioning is a technique for reinforcing concrete slabs which provides pre-stressing through tensioned steel cables or strands which adds structural strength to concrete frames.

This video animation demonstrates how the RiserSafe® system is cast in and the letter box opening in the side wall of the units to post tensions the concrete floors with blank floor plates to be exchanged for new floor plates with M&E service penetrations pre-cut and lids fixed at the factory for complete safety on site.

Request a call back

Discover how RiserSafe® can improve your project by requesting a call back from one of our technical team members.

FREE download centre

Visit our FREE download centre to discover RiserSafe® product information and specifications.