01707 324523 info@ambar-kelly.com
Designer and manufacturer of RiserSafe®
CE Certified
SCCS Certificates
Patented Design
GB 2429021B
GB 2443693B
Health & Safety
CDM 2015 Compliant
REQUEST CALL BACK

3 Snowhill Queensway Birmingham

snow hill

Built in the heart of Birmingham, this building has 18 floors steel frame around 3 concrete cores. Being a very constrained site, close coordination was required with the structural steel frame contractor. Two deliveries a week were required to ensure their programme was met.

RiserSafe® units protected the construction workforce from the spread of smoke and flame in the unlikely event of a fire on site to meet fire protection on construction sites Joint Codes of Practice (JCoP). Further horizontal fire protection was required within the riser zone. This was accomplished by setting the floor plate of the particular units down by 50mm inside the system to provide the formwork for a fire compound to be installed once the M&E services are complete.

Where RiserSafe® units were positioned at the edge of the floor plates, additional detachable hand rails were provided as part of the system to protect the workforce on site until the external elevation was completed.

Jamie McCrum, Site Manager for Severfield wrote to Ambar Kelly and said “Just a quick line to say thank you all for your efforts and help throughout my time at the Snowhill project. I know at times we asked for a lot, but it is a credit to your company that not once did you step back from the plate.”

Project Details

Snowhill provides a bold vision for replicating the success of places like Canary Wharf.
Client Bam
Main Contractor Bam
Type of Development New build
Structure Concrete core & steel frame
Project Value £200m
Contract Value £500k

Request a call back

Discover how RiserSafe® can improve your project by requesting a call back from one of our technical team members.

FREE download centre

Visit our FREE download centre to discover RiserSafe® product information and specifications.